TECH-CHECK!

Interiors

1 The Work Plan Templates I  Based on our contracts

PDF  EXL    RMW Abbreviated Agreement for Interior Design

PDF  EXL    RMW Proposal Contract for Interior Design

PDF  EXL    AIA B152 2007 Owner-Architect Agreement

PDF  EXL    RMW Contract for Interior Design Services - Sacramento Studio

PDF  EXL   RMW Proposal Contract for TIs 

PDF  EXL    RMW Abbreviated Agreement for Space Planning

PDF HOW TO  Design and Use the Project Work Plan

2  The Drawings CHECK 

ListsComplex  Interiors

PDF  WD      Tech-Check List

PDF  RTF      General Notes I Occupied buildings

PDF RTF      General Notes I Non-occupied buildings

Standard Interiors 

PDF  WD      Tech-Check List

PDF  RTF      General Notes I Occupied buildings

PDF  RTF      General Notes I Non-occupied buildings







TIs

PDF  WD      Tech-Check List

PDF RTF      General Notes I Occupied Buildings

PDF RTF      General Notes I Non-occupied buildings

Special Uses 

PDF  WD      Tech-Check List I Special Use (General)

PDF  WD      Tech-Check List I Labs

PDF  WD      Tech-Check List I Alterations


PDF Index I Interiors I Drawings Tech-check Lists

PDF  WD      Tech-Check List I Special Use (General)








3 The Specifications TECH-CHECK Lists

Go!      Interiors Projects (all Divisions)


4 Tech Check Tools

Go!      Choose a Project Type

Go!      How to Design and Use the Project Work Plan

Go!      How to Use the Tech-Check Lists

Go!      How to Use the General Notes 

Go!      Tech-Checking General Recommendations

Go!      Tech-Checking Product Properties

Go!      Tech-Checking Details

Go!      More tools!








5 WHEN to use the Tech-Check Lists for SPECS

1.   Use them to verify selections you made, AND to find out what do you have to do during contract administration.  You will be surprised how much you learn!

2.   If you a need a product not included, notify our specifier.

6  MAKING THE tech-checking lists work for you

  • Use them before, during, and after the documentation process. 
  • Edit them as required for your project and as you go.
  • Use them BEFORE you start documenting your project to reduce errors from the beginning of documentation.
  • Use them DURING documentation to make sure you are progressing on track and to facilitate team coordination.  
  • Use them at COMPLETION for a final review before submitting.
  • SHARE the lists with the RMW team.